Retreat in Neufchâteau | House in Neufchâteau
2 Bedroom House in Neufchateau, Neufchâteau
Modern Comfort in Nature’s Embrace Escape to a serene, detached holiday home in the lush landscapes of Neufchâteau. This elegant retreat features spacious interiors, large garden doors that fill the space with natural light, and an infrared sauna for total relaxation. The roofed terrace and outdoor fireplace set the perfect mood for cozy evenings. Whether you're relaxing inside in air-conditioned comfort or unwinding under the stars, this stay offers the perfect balance of wellness and nature. Natural Wonders & Local Charm Located near the peaceful Lac de Neufchâteau, the area is a haven for outdoor lovers. Enjoy hiking, paddleboarding, or forest strolls with your furry companion. A short drive brings you to Bouillon Castle, offering medieval charm and sweeping views of the Semois River. The nearby woods provide endless pet-friendly walking paths and photo-worthy scenery in every season. Dining in the Ardennes Treat yourself to gourmet experiences at Le Château de Strainchamps, known for its refined seasonal cuisine. La Barrière de Transinne offers classic Belgian dishes in a cozy setting. For a relaxed local vibe, head to La Vendée, a favorite among residents. Several spots nearby welcome pets on their outdoor patios, so you can enjoy the region’s flavors without leaving your companion behind.
The interior of the accommodation can differ slightly from the pictures. However, the level of comfort is as described Type homes are divided into categories. Because these are private properties, they were decorated according to the owner’s personal taste and surface area, furnishing and size may vary – the level of comfort is as described, however. The arrangement of beds (sleeping places, separate beds or double beds) depends on the owner and cannot be determined beforehand. The pictures on display here serve as an example only Reservations for groups of persons under 21 years of age are not permitted This holiday home is available for recreational purposes only. Bookings on behalf of companies will be cancelled and possible cancellation costs will be charged Pets need to be mentioned during the booking process due to limited availability This accommodation is located in a holiday park. There are multiple units. To book more than one unit, please contact us via chat. For groups (such as groups of friends), young people and last-minute bookings, a deposit of € 50 p..p. / 500 p.p. may apply. If boat rental is included at the accommodation, or if the stay coincides with local fairs and festivals, a security deposit may be charged.
Layout: Ground floor: (hallway(toilet), Living room(TV(smart TV)), open kitchen(electric kettle, coffee machine(cups), oven, microwave, dishwasher, fridge-freezer), Bedroom with bathroom(double bed or 2 single beds, shower(walk-in shower), washbasin), Bedroom with bathroom(double bed or 2 single beds, shower(walk-in shower), infrared sauna, washbasin)) garden doors, air conditioning, terrace(roofed), garden furniture, outdoor fireplace
These costs are mandatory and charged on site. They are not included in the rental price.:
Final Cleaning; Included
Pets; Max. 2; € 6/Pet/Night (Pets need to be mentioned during the booking process due to limited availability)
Bed linen; Present
Tourist tax; € 1,97 /person/night (Indication)
Service charges; € 162 /stay; € 174 /stay; € 193,15 /stay
Optional services that you can arrange on site:
Bath towels; Present
Kitchen linen; Present
Wifi; Free
Retreat in Neufchâteau is located in Neufchateau. Retreat in Neufchâteau provides accommodation, featuring Internet, TV, Balcony/Terrace, among other amenities. This House features Internet, TV, Balcony/Terrace, to make your stay a comfortable one.
Retreat in Neufchâteau has 2 Bedrooms , 1 Bathroom, and max occupancy of 4 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated House because of the excellent services rendered by the owner or manager of this House, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. House has a friendly neighborhood, and the Neufchateau has interesting places to visit. If you want to learn more about the House in Neufchateau, such as places to visit and things to do nearby, you can check below to learn more.
Amenities
Facility Overview
-
Air conditioning
-
1 bathroom
-
Shower
-
2 bedrooms
-
Living room
-
Fireplace
-
Refrigerator
-
Coffee/tea maker
-
Oven
-
Microwave
-
Stovetop
-
Dishwasher
-
Electric kettle
-
Pet friendly
-
Smoke-free property
-
Bicycle on site
-
Cycling nearby
-
Smart TV with cable/satellite service
-
Unit size: 614 sq ft (57 sq m)
-
English
-
Dutch
-
French
-
Free WiFi
-
Firepit
-
Patio
-
Outdoor furniture
-
Carbon monoxide detector not reported (host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector)
-
Smoke detector installed (host has indicated there is a smoke detector on the property)
Policies
Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a smoke detector on the property host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector with you on the trip onsite parties or group events are strictly prohibited special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property accepts cash this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation